The accreditors of this session require that you periodically check in to verify that you are still attentive.
Please click the button below to indicate that you are.
Participate in a virtual view of the Methodist Olive Branch Hospital case study of the comprehensive HVAC system life cycle cost analysis that included the owner, architect, and subcontractors. The approach went beyond industry norms, taking patient outcomes and satisfaction into account, and included a field trip to the first known hospital to use a geothermal HVAC system. Ultimately, a geothermal-based water source heat pump system was determined to have optimal life cycle cost.
Speaker(s):
Randy
Keiser,
National Healthcare Director,
Turner Construction Company
Clay
Seckman,
P.E.,
Senior Principal,
Smith Seckman Reid, Inc
David
Rosenbaum,
PE,
Vice President,
Methodist Le Bonheur Healthcare
You must be logged in and own this session in order to
post comments.